Friday the bath arrived and the plaster starts to dry out. Monday the shelving unit was installed over the cistern. Tuesday the tiler started work on the walls.
Bathroom with bath, shelving and tiles
Even though they are moving along it is good that we have a shower and a second loo downstairs otherwise it would be off to work via the gym for a shower.
Previously: Bathroom Update (2), (1), (0)