Penrith, Cumbria. April-2022.
The end is nigh!
The units are now installed in the kitchen and utility / shower room bar four drawer fronts and the door for the dishwasher that are on back order. That means all the kitchen pots, pans, utensils, cleaning materials, etc. can be moved into the cupboards from various locations.
The knock on effect through the rest of the house has been enormous as items from the pantry, dresser and shed went into their rightful places in the kitchen and utility room. Boxes were brought down from the top bedrooms and the temporary cooking arrangements went out into the shed. The lock-up has been emptied of its remaining contents and given up, saving us the ongoing rental.
Luckily our friend Nigel was starting to pack up his house so was a very happy recipient of all our empty boxes, bubble wrap and lock-up storage unit.
The dishwasher is plumbed in so no more washing dishes in the bathroom sink! The utility room is now fully functional with shower and washing machine so more trips to the Coach House Laundry with Ikea bags full of washing.
The dining room is now fully operational. Following last month's plastering I painted the two untouched walls so we could move the dresser back in from the hallway. This month, once the plaster was dry, I painted the two remaining walls and the white above the picture rail. The cook book shelves are up and pictures hung.
The ceiling is still to be fitted but as this was more complicated than first thought, and would clash with the kitchen installation, we have delayed this until later in the year.
There were some bits of paint touch up in the kitchen where socket and switches had to be moved and around the edges in the utility room. Basically it is done apart from some painting of new skirting boards and doors - hurrah!
It will be lovely when it is finished!