The shower plumbing is complete and the cistern for the loo* is there. The walls are all re-plastered as are most of the holes in the ceiling where the old lights were. Yesterday a pallet load of tiles arrived for the floor and walls. But still no bath!
* Checking with my American colleague on the next desk perhaps I should translate this as: "the water reservoir for the toilet"
Previously: Bathroom Update (1), (0)
No comments:
Post a Comment